New Pavement Method Expected To Reduce Hydroplaning

NCDOT New Pavement Method


JOHNSTON COUNTY – Some sections of pavement will soon look different on Interstate 40 in Johnston County for a good reason.

New pavement meant to reduce hydroplaning

The N.C. Department of Transportation and university research partners are developing new methods and practices to enhance skid resistance along our highways. One of the strategies being evaluated is shotblasting the final pavement surface, generating more texture on the surface to allow for better drainage during wet weather events and enhancing frictional forces between the tire and pavement. Both benefits will work together to aid in the reduction of hydroplaning incidents.

This method has been used on new pavement that is set to open to traffic within the next few weeks, at which time drivers can expect to see discoloration in the asphalt along the I-40 project between Southeast Raleigh and Clayton. The discoloration does not indicate problematic pavement. The shotblasting machine collects dust and contaminants during the process and does not use chemical products or wastewater.

Information concerning the timing of new pavement strategy will be update on NCDOT.gov as soon as possible.

Previous articleRead To Grow Provides Over 800 Students With Books For The Summer
Next articleSchool Board And County Commissioners Collaborate To Enhance Educational Opportunities For Future Generations



This article was originally published by a jocoreport.com

Read it HERE

Share

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *